The big machine drove through and scraped off the ends of the swales, making a pathway for the trucks to come in and out. At this point I had to go inside and recover for a while. All this earthmoving is quite stressful for me. But David loves it. He was scampering about like a kid in preschool.
The good topsoil was scraped off and put aside in a big heap. We will use it to make a big raised bed for growing citrus. They like excellent drainage. At this stage of proceedings I went to work, so the following photos were taken by David as the day progressed.
This shot shows the boundaries of the future pool area marked out with pink string. It will be about 3 metres wide and one third of 50 metres long. So you do 6 laps and you've swum 100 metres. One lap is 16.66 recurring metres long. Our builder, Chris of Azure Pools jokes that he will be getting out the calipers to ensure the measurement is exact.
http://azurepools.com.au/pages/gallery/gallery.html
Beneath the topsoil was gluggy shaley clay.
All that awful gluggy stuff was put in trucks and carted away. Its not clear to us where it went, but not far. So someone must have a use for it.
By the end of the day, half a pool dug. Now, it just needs to not rain for a few days while the rest of it is dug and the concrete goes it. Hang on, what's that I'm hearing outside? Mm. Rain.
We're looking after the dogs next door while their Mummy and Daddy are away. Billy was just dying to get through that fence and investimigate what on earth was going on. You might well ask, Billy. What on earth are we up to?
Last one in is a rotten egg!

No comments:
Post a Comment